{"version":"1.0","provider_name":"The Turtle Island News","provider_url":"https:\/\/theturtleislandnews.com","author_name":"Lynda Powless","author_url":"https:\/\/theturtleislandnews.com\/index.php\/author\/lynda\/","title":"Green light for $450M Goose Harbour Wind Farm - The Turtle Island News","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"UKbCukrKuW\"><a href=\"https:\/\/theturtleislandnews.com\/index.php\/2025\/01\/08\/green-light-for-450m-goose-harbour-wind-farm\/\">Green light for $450M Goose Harbour Wind Farm<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/theturtleislandnews.com\/index.php\/2025\/01\/08\/green-light-for-450m-goose-harbour-wind-farm\/embed\/#?secret=UKbCukrKuW\" width=\"600\" height=\"338\" title=\"&#8220;Green light for $450M Goose Harbour Wind Farm&#8221; &#8212; The Turtle Island News\" data-secret=\"UKbCukrKuW\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script type=\"text\/javascript\">\n\/* <![CDATA[ *\/\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/theturtleislandnews.com\/wp-includes\/js\/wp-embed.min.js\n\/* ]]> *\/\n<\/script>\n","description":"By Alec Bruce\u00a0 \u00a0Local Journalism Initiative MULGRAVE \u2014 Backed by a $224-million loan from the Canada Infrastructure Bank (CIB) this week, Port Hawkesbury Paper Wind Ltd. (PHPW) has officially approved its Goose Harbour Lake Wind Farm in the Municipality of the District of Guysborough (MODG). \u201cThe project is now fully financed and a final investment decision has been made,\u201d PHPW Director Nigel Cave told The Journal at the federal funding announcement in Mulgrave on Jan 6. \u201cThe total project costs are in the neighbourhood of $450 million.\u201d The CIB loan will enable PHPW to build and install 24 Nordex cold-climate turbines on a 43-hectare plot of provincial Crown land. These turbines will generate up to 168 megawatts of energy, supplying roughly 60 per cent of the power needs for PHPW\u2019s","thumbnail_url":"https:\/\/theturtleislandnews.com\/wp-content\/uploads\/2016\/01\/facebooklogo.jpg","thumbnail_width":725,"thumbnail_height":483}